Bladen County
Bladen County
Ordinance Source URL(s)
Applicable Technologies
Solar
Technology Definition
Solar collection system: generates electricity from sunlight to a wholesale electricity market through a regional transmission organization and an interconnection with the local utility power grid and/or for direct distribution to a number of properties and consumers. Shall consist of a minimum of 3 individual photovoltaic modules.
Ordinance Source URL(s)
Setbacks
Screening
Fencing
Buffer
Height Restrictions
Visual Restrictions
Noise Restrictions
Decommissioning Plan
Decommissioning Requirements
Decommissioning Financial Assurance
Planning and Applications
Moratorium
Moratorium Expiration
Community Engagement
Date of Last Revision
Date of Last Verification
Summary
Bladen County, NC, regulates solar energy facilities as solar collection systems designed to generate electricity for wholesale markets or direct distribution through utility interconnection. Systems must include at least three photovoltaic modules and conform to the zoning district setbacks in which they are located. Facilities must be fenced, although no specific fence height is required. A vegetative buffer of evergreen species capable of reaching 10 feet within three years must be installed. Max 25 ft height. A decommissioning plan is required as part of the permit application and must comply with state regulations. Facilities must be removed within 12 months of ceasing operations.