ZONING ORDINANCE

Iredell County

Ordinance Source URL(s)

Applicable Technologies

Technology Definition

Solar Energy System: an array of solar collection devices (including all related equipment) to generate solar energy for collection and distribution, predominantly off-site use.

Setbacks

Must be 500 feet from any residential dwellings, excluding any dwellings on the same parcel of land as the device. 50 feet from any residentially zoned property, 100 feet from perennial streams, and 10 feet from commercial or industrial property.

Screening

Screening requirements may be added to address site specific and neighbor concerns as part of the Conditional Rezoning Process.

Fencing

6-foot fence

Buffer

N/A

Height Restrictions

N/A

Visual Restrictions

Solar must avoid glare onto adjacent properties and roadways; shall not be located in an airport primary approach zone.

Noise Restrictions

N/A

Decommissioning Plan

Decommissioning plan required as a part of the conditional zoning application. Must include identification of party responsible, all costs for removal down to 36 inches below grade, and restoration. Prior to issuance of building permit, the decommissioning plan will be record by the applicant in the Register of Deeds.

Decommissioning Requirements

6 months to complete decommissioning if no electricity generated for 12 months, unless the responsible party provides substantial evidence of intent to maintain and reinstate operation.

Decommissioning Financial Assurance

Must provide bond, cash escrow, or letter of credit equal to 1.25 times estimated decommissioning cost prior to the issuance of a zoning permit.

Planning and Applications

Conditional rezoning from district AC to AC-CD and from district RA to RA-CD; permitted with additional requirements in zones M1 and M2. Written affidavit stating that the facility is in compliance with all applicable Federal and state regulations required. Decommissioning plan and performance guarantee required.

Moratorium

No

Moratorium Expiration

N/A

Community Engagement

N/A

Date of Last Revision

December 2, 2025

Date of Last Verification

February 23, 2026

Summary

Iredell County, NC permits solar through conditional rezoning from district AC to AC-CD and from district RA to RA-CD, as well as with additional requirements in zones M1 and M2. The county regulates solar development by requiring a minimum 500-foot setback from residential dwellings, 50 feet from residentially zoned properties, 100 feet from perennial streams, and 10 feet from commercial or industrial properties. A 6-foot fence is required for security, and solar arrays must be designed to avoid glare on adjacent properties and roadways. A decommissioning plan is mandatory with identification of the responsible party and full cost estimates for removal and site restoration. Facilities must be decommissioned within 6 months if no electricity is produced for 12 months. Financial assurance in the form of a bond, cash escrow, or letter of credit at 125% of the estimated cost is required. A site plan must also be submitted with the application.